• The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

  • The 6,493 SF station includes a two-engine apparatus bay with a vehicle exhaust system, kitchen, dorm rooms, day room, exercise room, offices and support facilities. Erickson-Hall reduced the traditional design/bid/build approach by seven months when the City decided to utilize the design-build delivery method.  Erickson-Hall worked closely with the fire department to maximize the floor plan of this new station within the allowable site area and construction budget.

Chula Vista Station No. 6