Project Name: Jordan HS Bldgs 100 & 400

Addendum 1 issued

ERICKSON-HALL IS COMPETING FOR THE LEASE LEASE-BACK CONSTRUCTION OF JORDAN HS MAJOR RENOVATION PHASE 2A - BLDGS 100(A) & 400(G)

Modernization / Renovation of Building 100 (6,932 SF), Building 400 (14,940 SF) and Parking lot expansion. Work includes but not limited to demolition, grading, asphalt paving, landscaping, concrete, masonry, structural steel, metal deck, rough carpentry, casework, waterproofing, insulation, fireproofing, sheet metal, wall panels, doors/frames/hardware, glass / storefront, plaster, framing, drywall, ceramic tile, flooring, wall coverings, FRP, paint, marker/tackboards, flagepole, signage, lockers, toilet accessories, projection screens, food service equipment, window coverings, library equipment, plumbing, HVAC, electrical, low voltage (data, security, FA, TV, etc). 

MEP subcontractors shall be prequalified by the District to perform construction work as a first tier subcontractor on the Project pursuant to Public Contract Code section 20111.6. Prequalification submittals due by 06/29/17 if not currently listed as a prequalified contractor with the District.

Subcontractors must comply with SB-693 - Skilled and Trained Workforce

Bid Date: 08/27/2018 @ 2:00pm

Estimator: Mike Budd mbudd@ericksonhall.com  760-796-7700 ext 183

Files for the Project: Jordan HS Bldgs 100 & 400

Click on any folder to display the files contained inside that folder. Click on any file name to download the associated file.

jordan-hs-bldgs-100-400
01-Jordan Addm 1 Narrative.pdf
02-Jordan Addm 1 Plan Sheets.pdf
JHS_Administration_RECORD DRAWINGS.zip
JHS_Construction Phasing Plan 2A.pdf
JHS_Library_RECORD DRAWINGS.zip
JHS_PH2A_DRAWINGS.zip
JHS_PH2A_HAZMAT SURVEY REPORT and ABATEMENT SPECS.zip
JHS_PH2A_PRE-CHARACTERIZATION SAMPLING REPORT - Soils.pdf
JHS_PH2A_SPECS_VOL 1.pdf
JHS_PH2A_SPECS_VOL 2.pdf
JHS_Parking_Atlantic Entrance_RECORD DRAWINGS.pdf
JHS_SWPPP.pdf
Jordan OCIP Requirements.pdf
Phase 1D Striping Plan 1.pdf
Phase 1D Striping Plan 2.pdf


back to projects list